No.

Project

Client

Contract Period

1.

Malaysia – Singapore Second Crossing – rectification for damage slope, gullies and guard rail.

Link kedua

Since May 1999

2.

Road damage in Part of Jalan Air Baloi, Johor Bahru, Johor.

JKR

1999 To 2000

3.

Cleaning landslide, provide a temporary route, slopes repair work and other related work in the way up to   the Telekom station, Gunung Pulai, Johor.

Telekom Malaysia Bhd

2002

4.

Road widening entrance road and related works to Ibusawat Telekom Pandan, Johor Bahru, Johor.

Telekom Malaysia Bhd

2003

5.

Improved Bank, Slope and Road Bridge Connector KM 21 to KM 23.5 Jalan Johor Bahru - Kota Tinggi (FT 003)   in the District Johor Bahru, Johor.

JKR

2007

6.

Repair, strenghten and re-plaster the Jalan Serkat, Permas (J111), Pontian, Johor.

JKR

2001 To 2002

7.

Build and Upgrade Path from Felda Taib Andak to Felda Inas, Kulaijaya, Johor.

JKR

2012 To 2016